Connections and contracts
The connection offer process and group processing approach
SmartrGrid, Presentation by Ciara Corby, EirGrid, Customer Conference 2012.
EirGrid Smart grid programme and demonstration projects
Outage_Weeks_42(2015)-04(2016)
Outage_Weeks_42(2015)-04(2016)
Windfarm Performance Monitoring Process - October 2015
Windfarm Performance Monitoring Process - October 2015
Explanatory Paper for Transmission Loss Adjustment Factor (TLAF) Calculation Methodology
This document is an explanation or methodology of how Transmission Loss Adjustment factors are calculated step by step.
Powerpoint Presentation on Towers
Presentation shows different array of towers including IVI Design, VVV Design and Inverted Delta Design
APPENDIX A Approach to the Development of Electricity Transmission Lines
The purpose of this document is to provide information as to how we progress our large-scale transmission infrastructure projects over a number of key stages - through the public planning process, to construction and eventual operation.
Project development and Consultation Road Map
Project development and Consultation Road Map showing stages 1 to 5
Map showing route corridors (no title)
Map showing Route corridor A, 3B, preferreded route corridor for the Northern portion of the 400kV OHL, exisitng 220kV OHL and Indicative 400kV Line Route
Tarbert 220kV Substation Redevelopment Proposed Overhead Line & Cable Route Diversion - Figure 4 Map
A3 Tarbert 220kV Substation Redevelopment Proposed Overhead Line & Cable Route Diversion - Figure 4 Map AT SCALE 1:10,000