EirGrid Position on NEPP Askon Study � Report Summary

01 October 2015

This report presents EirGrid�s position in relation to the findings of Askon�s �Study on the Comparative Merits of Overhead Lines and Underground Cables as 400kV Transmission Lines for the North-South Interconnector Project�, commissioned by North East Pylon Pressure (NEPP).

Ancillary Service Agreement

01 October 2015

The Ancillary Services Agreement details payment and charge arrangements between EirGrid and Ancillary Service Providers.

Meath-Cavan and Cavan-Tyrone 400 kV Power Lines Progression to Phases Three and Four (Draft) CP466-ER-027

01 October 2015

This report documents a short project history and outlines the process by which EirGrid is moving the projects to the next phase by nominating one preferred route corridor for each power line project for further study.

Preferred Route Corridors

01 October 2015

Preferred Route Corridors Map (no title)

Meath-Cavan and Cavan-Tyrone 400kV Power Line Projects Community Update EirGrid progresses 400kV power line projects to next phase

01 October 2015

Following a review of all project documentation, including consultants� studies, reports, and consultation feedback, EirGrid has nominated one preferred route corridor for each 400kV power line project for further study.

Outage_Weeks_41(2015)-03(2016)

30 September 2015

Outage_Weeks_41(2015)-03(2016)

Operational Constraints Update

30 September 2015

Operational Constraints Update

MPID 223 Fail to Sync Approval Letter

28 September 2015

MPID 223 - Fail to Sync CER Approval Letter

MPID 250 Recommendation

28 September 2015

MPID 250 Recommendation

WFPS Signal Lists

28 September 2015

WFPS Signal Lists