North-South 400kV Interconnection Development Project Activity - 2014

31 December 2014

North-South 400kV Interconnection Development Project Activity - 2014

Operational Constraints Update

20 December 2014

Operational Constraints Update

EirGrid Group Research Application Form

08 December 2014

Download the EirGrid Group research application form

Long Term Auction Timetable 2014

27 November 2014

Long Term Auction Timetable 2014

Transmission Network Optimisation, Mario Duarte,

24 November 2014

Transmission Network Optimisation, Mario Duarte, Transmission Network Planning

Operational Constraints Update

18 November 2014

Operational Constraints Update

Test Procedure Reliability Run

11 November 2014

Template test procedure for completion of reliability run

Note on Electromagnetic Transient Models

03 November 2014

Note on Electromagnetic Transient Models

Dynamic Model Validation Guidelines Draft

03 November 2014

Dynamic Model Validation Guidelines Draft

TSO Position Paper on Retrospective Application of MPID239

03 November 2014

TSO Position Paper on Retrospective Application of MPID239