Letter from ABP 11 September 2014 - Concept for Public Participation on North South Interconnector

15 October 2015

Letter from ABP 11 September 2014 - Concept for Public Participation on North South Interconnector

North South 400kV Interconnection Development Concept for Public Participation Plus Associated Appendices

15 October 2015

North South 400kV Interconnection Development Concept for Public Participation Plus Associated Appendices

CMSA Proposed Final Line Design

15 October 2015

CMSA Proposed Final Line Design for North South 400kV Interconnection Development

Grid Link Project - Consultation Brochure

15 October 2015

Grid Link Project - Consultation Brochure following third round of consultation in Autumn 2013

Grid Link Project - Report to the Independent Expert Panel

15 October 2015

Grid Link Project - Report to the Independent Expert Panel

Grid Link Project - Summary of Independent Expert Panel Report

15 October 2015

Summary of EirGrid's report to the Independent Expert Panel on the Grid Link Project

Dublin North Fringe Consultant's Report Appendix High Voltage Cable Routes

15 October 2015

Dublin North Fringe Consultant's Report Appendix High Voltage Cable Routes

Curraghamulkin Information Brochure

15 October 2015

Information brochure on the Curraghamulkin brochure.

West Dublin Stage 2 Report

15 October 2015

West Dublin Stage 2 Report

West Dublin Stage 1 Report

15 October 2015

West Dublin Stage 1 Report