PROPOSED MULLINGAR ELECTRICITY REINFORCEMENT SCHEME PUBLIC CONSULTATION

01 October 2015

This document details EirGrid proposing this Mullingar electricity reinforcement. And gives details of the proposed new transmission infrastructure which will consist of a new 110 kV circuit.

EIRGRID INFORMATION IN RELATION TO TWO PROPOSED OVERHEAD POWER LINES

01 October 2015

Questions were raised with EirGrid about the proposed 400kV power line projects from Woodland to Kingscourt, and from Cavan to Tyrone.This document details EirGrid undertaking a consultation process on a number of possible routes, with a view to lodging a planning application in 2008.

EIRGRID INFORMATION IN RELATION TO TWO PROPOSED OVERHEAD POWER LINES

01 October 2015

Questions were raised with EirGrid about the proposed 400kV power line projects from Woodland to Kingscourt, and from Cavan to Tyrone.This document details EirGrid undertaking a consultation process on a number of possible routes, with a view to lodging a planning application in 2008.

EirGrid Publishes Key New Report on Proposed North South Interconnector

01 October 2015

EirGrid is seeking feedback on a key new report on the proposed north south interconnector, a cross-border scheme that will improve the all-island electricity system.

EirGrid Irish Sea survey for electricity link completed Routes for undersea cable identified

01 October 2015

A marine survey to map a route for high voltage electricity cables between Wales and the Republic of Ireland has just been completed. Initial results now confirm technically feasible routes from Rush, Co. Dublin to North Wales.

CLASHAVOON DUNMANWAY South-West Projects

01 October 2015

CLASHAVOON DUNMANWAY South-West Projects Briefing Document

Independent Health Review confirms East West Interconnector is Safe

01 October 2015

document cover An Independent Health Expert Opinion commissioned by Minister Eamon Ryan has confirmed that the EirGrid West Interconnector poses no health risk.

EIRGRID ANNOUNCES EXTENSION OF PUBLIC INFORMATION AND CONSULTATION PROCESS

01 October 2015

DOCUMENT GIVES DETAILS OF PUBLIC INFORMATION AND CONSULTATION PROCESS

Emerging Preferred Substation Site and Route Corridors Map Figure 7.2

01 October 2015

A3 Emerging Preferred Substation Site and Route Corridors Map Figure 7.2 AT SCALE 1:25,000

Emerging Preferred Substation Site and Route Corridor Options Map Figure 7.1

01 October 2015

A3 Emerging Preferred Substation Site and Route Corridor Options Map Figure 7.1 AT SCALE 1:25,000