Route Corridor Environmental Constraints Map Figure 5.1

01 October 2015

A3 Route Corridor Environmental Constraints Figure 5.1 AT SCALE 1:25,000

Substation Site Environmental Constraints Map Figure 4.1

01 October 2015

A3 Substation Site Environmental Constraints Figure 4.1 AT SCALE 1:25,000

Route Corridor Selection Map Figure 3.2

01 October 2015

A3 Route Corridor Selection Map Figure 3.2 AT SCALE 1:30,000

Substation Site Selection Map Figure 3.1

01 October 2015

A3 Substation Site Selection Map Figure 3.1 AT SCALE 1:30,000

Millstreet Constraints Map Figure 2.2

01 October 2015

A3 Millstreet Constraints Map Figure 2.2 AT SCALE 1:30,000

Preliminary Constraints Map Figure 2.1

01 October 2015

A3 Preliminary Constraints Map Figure 2.1 AT SCALE 1:35,000

MillStreet Project Figure 1.1 Map

01 October 2015

A3 MillStreet Project Figure 1.1 Map AT SCALE 1:35,000

Static Magnetic Fields and the East West Interconnector

01 October 2015

The East West Interconnector utilises a Direct Current (DC) system which produces low level static magnetic fi elds. Some people have questioned whether there are health risks from the Interconnector. We would like to reassure you that there are no health concerns in relation to the East West Interconnector.

EirGrid Position on NEPP ASKON Study Document Number: GDC-IR003-00

01 October 2015

The purpose of this EirGrid document is to briefly review the Askon Study and particularly to examine those understandings that may or may not correlate with EirGrid�s and EirGrid�s consultants own understandings.

EirGrid Approach to the Development of Electricity Transmission Lines Brochure

01 October 2015

The purpose of this document is to provide information as to how we progress our large-scale transmission infrastructure projects over a number of key stages - through the public planning process, to construction and eventual operation.