MPID 299 Recommendation Paper
MPID 299 Reduction of Aggregator Limit to 1 MW
MPID 300 Solar PV Signal Requirements
Given the proposed increase in large-scale solar development in Ireland it is necessary to include, in the Grid Code, the required solar farm meteorological and availability data signals.
DS3 System Services Protocol Consultation Information Session
This publication is a PDF of the DS3 System Services Protocol Consultation Information Session slide deck that was presented on 22/03/2022.
ECP 2.1 Constraints Report – FAQ Document
ECP 2.1 Constraints Report – FAQ Document