Transmission Outage Summary 2018 (Week 37-38)

30 August 2018

Two week summary of transmission outages

Outage Week 36(2018)-51(2018)

29 August 2018

16 Week All-Island Generator Outage Plan

System Non-Synchronous Penetration: Definition and Formulation

27 August 2018

The SNSP metric was developed to provide a single constraint that captures a range of issues. The metric is deemed a prudent constraint to apply in real-time operation.

Operational Constraints Update

24 August 2018

Monthly update of all island system constraints

Historical Wind Dispatch Down (Constraint and Curtailment) Percentages in Ireland and Northern Ireland

22 August 2018

Historical Wind Dispatch Down (Constraint and Curtailment) Percentages in Ireland and Northern Ireland

TSO Connected Renewable Generation

22 August 2018

TSO Connected Renewable Generation

Outage Week 35(2018)-50(2018)

22 August 2018

16 Week All-Island Generator Outage Plan

Proposal for RfG Banding Thresholds Final Position Paper - Ireland

22 August 2018

Position Paper for the banding thresholds of the RfG requirements for Ireland.

Cross Shannon Cable Project - Information Brochure Number 1

21 August 2018

Information booklet on Cross Shannon Cable Project

Controllability Status Update

21 August 2018

Three level hierarchy classification for Wind farms