Contracted TSO (Non-Wind) Generators as of 11 February 2022
Updated report, re connected projects
Contracted TSO Wind Farms as of 11 February 2022
Updated report, re connected projects
ECP 2.1 Constraints Report – Line Ratings
ECP 2.1 Solar and Wind Constraints Report – Line Ratings
Outage Week 07(2022)-22(2022)
16 Week All-Island Generator Outage Plan
Requirements for WECC Model Submission v1.0
Newly developed document to provide information on the requirements for WECC model submissions.
Fault Ride Through Study Template v2.0
This document is a major update to the template for the submission of Fault Ride-Through Studies.
WECC Model Submission Spreadsheet v1.0
This spreadsheet is for the 2nd generation WECC generic model parameter submissions.
Quarterly Imperfections Cost Report Oct – Dec 2021
Quarterly update of factors affecting Imperfections costs.
ECP 2.1 Constraints Report – Wind & Solar Gen. Tables
ECP 2.1 Solar and Wind Constraints Report – Wind and Solar Generation Tables
Outage Week 06(2022)-21(2022)
16 Week All-Island Generator Outage Plan