Consultation Response Template - Ireland

20 December 2017

Consultation Response Template - Ireland

RfG Consultation on Parameter Selection – Ireland

20 December 2017

RfG Consultation on Parameter Selection – Ireland

Outage-Weeks-52(2017)-15(2018)

20 December 2017

Outage-Weeks-52(2017)-15(2018)

Generation Plant Closure Process

20 December 2017

This paper outlines the process governing generation unit closure in Ireland and Northern Ireland.

SmartValve Pilot Project 2016

20 December 2017

This report describes a pilot SmartValve project that EirGrid has conducted in association with Smart Wires

WFPS OR Test Procedure Template

19 December 2017

Test Procedure Template for WFPS wishing to apply for a DS3 System Services Operating Reserve Contract

Synchronous Machine OR Test Report Template

19 December 2017

Test Report template for Synchronous Machine Units wishing to apply for a DS3 System Services Operating Reserve contract

Synchronous Machine OR Test Procedure Template

19 December 2017

Test procedure template for Synchronous Machine Units wishing to apply for a DS3 System Services Operating Reserve contract

Interconnector SSRP Test Report Template

19 December 2017

Test report template for Interconnectors wishing to apply for a DS3 System Services Steady State Reactive Power contract

Interconnector SSRP Test Procedure Template

19 December 2017

Test Procedure template for Interconnectors wishing to apply for a DS3 System Services Steady State Reactive Power contract