Hybrid Multiple Legal Entities Consultation

03 September 2020

Hybrid Multiple Legal Entities Consultation

Approved 2021 Generator Transmission Use of System (GTUoS) Tariffs

03 September 2020

Approved 2021 Generator Transmission Use of System (GTUoS) Tariffs

Hybrid Multiple Legal Entities Questionnaire Template 2020

03 September 2020

Questionnaire Template

Outage Week 37(2020)-52(2020)

02 September 2020

16 Week All-Island Generator Outage Plan

CP1132 Proposed Cow Cross New 110 kV Transformer AA Screening

02 September 2020

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

CP0841 Proposed Arva to Carrick-on Shannon 110 kV Uprate AA Screening

02 September 2020

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

Cloncreen AA Screening Determination

02 September 2020

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

Transmission Outage Programme 2020

02 September 2020

A list of planned outages for the remainder of 2020

Proposed Testing Tariffs 2021

02 September 2020

Proposed Testing Tariff Rates for 2021

Wind Forecasting Accuracy Report – August 2020

01 September 2020

Wind forecasting accuracy report