Wind Forecasting Accuracy Report – November 2019

16 December 2019

Wind forecasting accuracy report

Outage Week 51(2019)-14(2020)

11 December 2019

16 Week All-Island Generator Outage Plan

Contracted TSO (Non Wind) Generators as of 11 December 2019

11 December 2019

Updated report, re connected projects

Contracted TSO Wind Farms as of 11 December 2019

11 December 2019

Updated report, re connected projects

Flagford - Louth 220 kV Line Refurbishment- EirGrid AA Screening Determination”

09 December 2019

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

Maynooth - Woodland 220 kV Line Refurbishment- EirGrid AA Screening Determination

09 December 2019

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

AA Ballyvouskill Reactor - EirGrid AA Screening Determination

09 December 2019

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive

AS OSC Report October 2019

09 December 2019

This report contains a monthly breakdown of the Ancillary Services & Other System Charges for the 2019/2020 tariff year.

Other System Charges (OSC) Trip Report 2019-20

09 December 2019

This report contains a monthly breakdown of the All Island Trip Charges for the 2019/2020 tariff year.

Controllability Status Update November

06 December 2019

Three level hierarchy classification for Wind farms