Proposed Transmission Loss Adjustment Factors 2017/18 – Amendment for I-SEM Deferral - PDF

01 May 2018

Proposed Transmission Loss Adjustment Factors 2017/18 – Amendment for I-SEM Deferral - PDF

EIDAC Electricity Interconnector Operator Licence in GB

01 May 2018

This document provides public access about the license of Electricity Interconnector

Operational Constraints Update - 30 April 2018

01 May 2018

Monthly update of all island system constraints

Natura Impact Statement to accompany the Draft Grid Implementation Plan 2017-2022

30 April 2018

This report examines the possible impact of grid development on nature conservation sites designated Special Areas of Conservation and Special Protection Areas.

Strategic Environmental Assessment - Environmental Report to accompany the Draft Grid Implementation Plan 2017-2022

30 April 2018

This report aims to ensure that environmental considerations form part of the preparation of grid development plans and programmes before their completion.

Draft Grid Implementation Plan 2017-2022

30 April 2018

The draft Grid Implementation Plan 2017-2022 outlines how the grid will be developed over the next five years.

Q1 2018 ATR Status Update – 30 April 2018

30 April 2018

Q1 2018 quarterly update on the status of transmission reinforcement works associated with generation projects (known as ATRs).

Quarterly Imperfections Cost Report Jan-Mar 2018

27 April 2018

Quarterly Imperfections Cost Report Jan-Mar 2018

DS3 System Services Industry Forum Volume Capped Consultation Slides - 25 April 2018

27 April 2018

The purpose of this industry forum was to inform on the DS3 System Services Volume Capped Consultation.

2018 Wind Dispatch Down Report - Qtr 1

26 April 2018

2018 Wind Dispatch Down Report - Qtr 1