Proposed 2016/2017 Transmission Loss Adjustment Factors - PDF Version

27 May 2016

Transmission Loss Adjustment Factors applied to generation in the market

Form GEN04 - Generator Outage Detail Form

26 May 2016

Form GEN04 - Generator Outage Detail Form

Transmission Outage Summary 2016 (Week 23-24)

26 May 2016

Transmission Outage Summary 2016 (Week 23-24)

Operational Constraints Update - May 2016

25 May 2016

Monthly update of all island system constraints. May 2016

Outage Weeks 21(2016)-37(2016)

25 May 2016

Outage Weeks 21(2016)-37(2016)

DS3 Demand Side Management Workstream Plan 2016

23 May 2016

This document contains a workstream description of the plan for achieving the DS3 Programme.

DS3 Voltage Control Workstream Plan 2016

23 May 2016

This document contains a workstream description of the plan for achieving the DS3 Programme.

DS3 Control Centre Tools and Capabilities Workstream Plan 2016

23 May 2016

This document contains a workstream description of the plan for achieving the DS3 Programme.

DS3 Frequency Control Workstream Plan 2016

23 May 2016

This document contains a workstream description of the plan for achieving the DS3 Programme.

DS3 Wind Security Assessment Tool (WSAT) Workstream Plan 2016

23 May 2016

This document contains a workstream description of the plan for achieving the DS3 Programme.