Celtic Interconnector Project Map - Knockraha - Converter station option and cable route

11 November 2019

Celtic Interconnector Project Map - Knockraha - Converter station option and cable route

Celtic Interconnector Project Map - Kilquane - Converter station option and cable route

11 November 2019

Celtic Interconnector Project Map - Kilquane - Converter station option and cable route

Celtic Interconnector Project Map - Claycastle - Landfall location and cable route

11 November 2019

Celtic Interconnector Project Map - Claycastle - Landfall location and cable route

DS3 System Services Volume Uncapped New Signals Requirements v2.0

11 November 2019

This document updates the new DS3 System Services signals requirements for applicable Providing Units to include signals from Energy Storage Units

Celtic Interconnector Project Update Brochure - Step 4

11 November 2019

Celtic Interconnector Project Update Brochure - Step 4

Winter Outlook 2019/20

08 November 2019

Winter Outlook 2019/20

All-Island Ten Year Transmission Forecast Statement 2018 - Study Files

08 November 2019

These are the Study Files to accompany All-Island Ten Year Transmission Forecast Statement (TYTFS) 2018. The TYTFS describes and presents technical network data such as the network configuration, network parameters, generation connections and power flows, and fault levels for future network conditions. This enables the reader to carry out their own network analysis if they wish. In addition, the TYTFS outlines opportunities for demand and generation connections in Ireland and Northern Ireland. The TYTFS forms part of SONI’s and EirGrid’s statutory and licence obligations.

Controllability Status Update

08 November 2019

Three level hierarchy classification for Wind farms

Quarterly Imperfections Cost Report Jul – Sep 2019

07 November 2019

Quarterly update of factors affecting imperfections costs.

Transmission Outage Summary 2019 (Week 47-48)

06 November 2019

Two week summary of transmission outages