WFPS Active Power Control Test Procedure

05 September 2016

WFPS Active Power Control Test Procedure

AS OSC Report July 2016

05 September 2016

This report contains a monthly breakdown of the Ancillary Services & Other System Charges for the 2015/2016 tariff year.

TSO Connection Offer Disclosure of Applications as published on 2 September 2016

05 September 2016

TSO Connection Offer Disclosure of Applications as published on 2 September 2016

DSO Connection Offer Disclosure of Applications as published on 2 September 2016

05 September 2016

DSO Connection Offer Disclosure of Applications as published on 2 September 2016

Contracted TSO Wind Farms 1 September 2016

05 September 2016

Contracted TSO Wind Farms 1 September 2016

Contracted TSO (Non Wind) Generators 1 September 2016

05 September 2016

Contracted TSO (Non Wind) Generators 1 September 2016

Connected TSO (Non Wind) Generators 1 September 2016

05 September 2016

Connected TSO (Non Wind) Generators 1 September 2016

North South Interconnector Costs

01 September 2016

North South Interconnector Costs

Transmission Outages Weeks 37-38

31 August 2016

Transmission Outages Weeks 37-38

Outage Weeks_36(2016)-51(2016)

31 August 2016

Outage Weeks_36(2016)-51(2016)