Earthing and Lightning Protection (XDS-GFS-12-001-R4)

09 March 2022

Earthing and Lightning Protection standard

Dynamics Model Register March 2022

09 March 2022

EirGrid's Dynamic Model Register for Power Park Modules (PPMs). This document lists the current portfolio of PPM dynamic models that have been assessed or are in the process of being assessed by EirGrid.

Kildare-Meath Grid Upgrade 4A Report

08 March 2022

This Step 4A Report presents an analysis of the proposed route options. It describes the process followed to identify and evaluate the proposed route options.

Kildare-Meath Grid Upgrade 4A Report

07 March 2022

This Step 4A Report presents an analysis of the proposed route options.

Kildare-Meath Grid Upgrade, Step 4 - Consultation Summary Report

07 March 2022

This report provides a summary of responses received to the Step 4 Consultation on the proposed Kildare-Meath Grid Upgrade, undertaken by EirGrid between 31 August and 22 November 2021.

Kildare-Meath Grid Upgrade Brochure

07 March 2022

The Kildare-Meath Grid Upgrade will add a high-capacity, underground electricity connection between Dunstown substation in County Kildare and Woodland substation in County Meath.