ECP 2.1 Solar and Wind Constraints Report – Area F – v1.0

21 December 2021

ECP constraints report for Area F

ECP 2.1 Solar and Wind Constraints Report – Area E – v1.0

21 December 2021

ECP constraints report for Area E

ECP 2.1 Solar and Wind Constraints Report – Area D – v1.0

21 December 2021

ECP constraints report for Area D

ECP 2.1 Solar and Wind Constraints Report – Area C – v1.0

21 December 2021

ECP constraints report for Area C

ECP 2.1 Solar and Wind Constraints Report – Area B – v1.0

21 December 2021

ECP constraints report for Area B

ECP 2.1 Solar and Wind Constraints Report - Area A - v1.0

21 December 2021

ECP constraints report for Area A

Firm Access Review

21 December 2021

This document summaries the research and development phase, the core concepts of firm access allocation, the details of the new methodology and the next steps.

Qualification Trial Process (QTP) Call for Information

21 December 2021

The QTP is the mechanism through which the TSOs are managing the transition to a wider portfolio of System Services’ Providers. This paper seeks stakeholder views on the current QTP process and areas the TSOs should focus on.

EirGrid Monthly Availability Report - November 2021

20 December 2021

EirGrid Monthly Availability Report - November 2021

EirGrid Grid Code- version 10

20 December 2021

The Grid Code is the technical document which establishes the rules governing the operation, maintenance and development of the transmission system and sets out the procedures for governing the actions of all transmission system users.