FOI Disclosures Log 2022

16 January 2023

Excel Document with details of FOI requests for the year 2022.

16 January 2023

Celtic Interconnector Community Forum Meeting

13 January 2023

6th December

ECP 2.2 Solar and Wind Constraints Report - Node Results in Excel Format

12 January 2023

ECP 2.2 Constraints Analysis Area Reports

ECP 2.2 Solar and Wind Constraints Report – Area Wind and Solar Profiles

12 January 2023

ECP 2.2 Constraints Analysis Area Reports

Outage Week 03(2023)-18(2023)

11 January 2023

16 Week All-Island Generator Outage Plan

Transmission Outage Summary 2023 (Week 01-05)

11 January 2023

Transmission Outage Summary 2023 (Week 01-05)

Transmission Outage Summary 2022 (Week 49-52)

11 January 2023

Transmission Outage Summary 2022 (Week 49-52)

Celtic Interconnector Community Forum

11 January 2023

Meeting minutes 29th September 2022