ECP-2.2 TSO Category A Batch

18 May 2022

ECP-2.2 Category A Update to include nodal assignment, planning permission details and offer issuance quarters.

​FFR assessment

17 May 2022

In response to industry feedback the TSOs have published further details here on the calculation behind the FFR Performance Assessment (Section 5.14 of the DS3 System Service Protocol – Regulated Arrangements). This document has previously been circulated via email to existing Service Providers of the FFR service for their information.

EirGird Stakeholder Engagement Report 2021

17 May 2022

A report summarising EirGrid stakeholder engagement activity over 2021.

Transmission Outage Programme 2022

16 May 2022

Transmission Outage Programme 2022

Transmission Outage Summary 2022 (Week 21-22)

16 May 2022

Summary of outages on the transmission system in weeks 21 and 22

Uasghrádú Eangach na Mí ThoirBhaile Átha Cliath Thuaidh

15 May 2022

Tionscadal Caipitil 1021 Céim 3 Bróisiúr um Nuashonrú Earrach 2022

EirGrid Powering Up Dublin Information Brochure

15 May 2022

EirGrid is planning a major, multi-year upgrade of the Dublin electricity grid in order to facilitate Government renewable energy targets and meet growing demand in the capital. This involves installing up to 50km of cables across the city. Some cables will replace existing cables and some will be new. We will also upgrade some electricity substations and build new substations to support Dublin’s electricity network.

Fault Ride Through Study Template v2.1

12 May 2022

This document is a minor update to the template for the submission of Fault Ride-Through Studies.