EirGrid Monthly Availability Report - September 2022

27 March 2023

EirGrid Monthly Availability Report - September 2022

EirGrid Monthly Availability Report - August 2022

27 March 2023

rid Monthly Availability Report - August 2022

EirGrid Monthly Availability Report July - 2022

27 March 2023

EirGrid Monthly Availability Report - July 2022

EirGrid Monthly Availability Report - June 2022

27 March 2023

EirGrid Monthly Availability Report - June 2022

System Margins Outlook Report 24.03

24 March 2023

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

Operational Notification Procedure

24 March 2023

Information note on the Operational Notification Procedure

Outage Week 13(2023)-28(2023)

22 March 2023

16 Week All-Island Generation Outage Plan

System Margins Outlook Report 20.03

20 March 2023

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate

Enduring Connection Policy - 2.3 (ECP-2.3) 2022 Category A Initial Batch

16 March 2023

This report contains the final list of applicants that will be processed under Category A as part of the 2022 ECP-2.3 batch following payment of the balance of application fees to the relevant SO.