CP1152 Arva protection Upgrade AAS Determination

16 November 2021

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

CP1149 Newbridge Cushaling 110kV line Stations Bay Conductors and Lead in Conductor Uprate

16 November 2021

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

CP1114 Drybridge and Platin AAS Determination

16 November 2021

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

CP1032 Cashla 220kV Station Circuit Breaker Replacement AAS Determination

16 November 2021

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

CP1031 Flagford 220kV Station Circuit Breaker Replacement AAS Determination

16 November 2021

The document sets out EirGrid’s Appropriate Assessment Screening determination as to whether the project is likely to significantly affect European sites designated by the EU Habitats Directive.

Scheduling and Dispatch Assurance Report 2020

16 November 2021

Regulatory requirement to undertake an annual audit of the scheduling and dispatch process and for us to publish the outcome.

Transmission Outage Programme 2021

15 November 2021

2021 Transmission Outage Programme

Transmission Outage Summary 2021 (Week 46-47)

12 November 2021

summary of transmission system outages in Week 46 and 47

Transmission Outage Summary 2021 (Week 44-45)

12 November 2021

Summary of transmission system outages in Week 44 and 45