ECP 2.1 Constraints Report – Line Ratings

10 February 2022

ECP 2.1 Solar and Wind Constraints Report – Line Ratings

Outage Week 07(2022)-22(2022)

09 February 2022

16 Week All-Island Generator Outage Plan

Requirements for WECC Model Submission v1.0

07 February 2022

Newly developed document to provide information on the requirements for WECC model submissions.

Fault Ride Through Study Template v2.0

07 February 2022

This document is a major update to the template for the submission of Fault Ride-Through Studies.

WECC Model Submission Spreadsheet v1.0

07 February 2022

This spreadsheet is for the 2nd generation WECC generic model parameter submissions.

Quarterly Imperfections Cost Report Oct – Dec 2021

04 February 2022

Quarterly update of factors affecting Imperfections costs.

ECP 2.1 Constraints Report – Wind & Solar Gen. Tables

03 February 2022

ECP 2.1 Solar and Wind Constraints Report – Wind and Solar Generation Tables

Outage Week 06(2022)-21(2022)

02 February 2022

16 Week All-Island Generator Outage Plan

Q4 2021 ATR Status Update - published 31-January-22

31 January 2022

The document provides a quarterly update on ATR completion or scheduled completion dates, so that generators can track the status of the ATRs associated with their generation project(s).

ECP 2.1 Solar and Wind Constraints Report – Area Wind and Solar Profiles

27 January 2022

ECP 2.1 Solar and Wind Constraints Report – Area Wind and Solar Profiles