MPID 296 (Recommendation Papers issued)
MPID 296 – Correction of Wind Powered Controllable PPMs.
MPID 292 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 292
MPID 291 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 291
MPID 290 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 290
MPID 289 (CRU Approval 17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 289.
MPID 278 (Recommendation Papers issued)
MPID 278 Revised – Correction of Reactive Power Capability Requirements under CC.7.3.6.1
MPID278 CRU Approval (17/12/2021)
Approval of the Grid Code Modification Recommendation MPID 278
MPID 293 DSU Maximum Down Time
Grid Code Modification Proposal Form
ECP 2.1 Solar and Wind Constraints Report - Node Results
ECP 2.1 Solar and Wind Constraints Report - Node Results in Excel format.