SOEF Operations – Information – Low Carbon Inertia Services
Webinar to provide an introduction to, and overview of, our proposed Low Carbon Inertia Service consultations and procurement plans.
WFPS Test Report Template for Scaler Reset
Template report for WFPS wishing to reset a data poor performance scalar following testing.
EirGrid Group Employee Code of Conduct
Within EirGrid Group, all our Board Members and employees adhere to codes which outline our approach to responsible business behaviours. The main premise of our Codes is that everyone will strive to perform their duties in accordance with the highest standards of integrity, loyalty, fairness and confidentiality and that we will abide by all legal and regulatory requirements.
Code of Conduct for Directors
Within EirGrid Group, all our Board Members and employees adhere to codes which outline our approach to responsible business behaviours. The main premise of our Codes is that everyone will strive to perform their duties in accordance with the highest standards of integrity, loyalty, fairness and confidentiality and that we will abide by all legal and regulatory requirements.
2022 Standard Transmission Charges
This document sets out the standard transmission charges and timelines for some asset classes to be used by EirGrid when issuing offers for connection to the transmission system. These charges are updated annually to reflect the change in Harmonised Index of Consumer Prices (HICP), as published by the Central Bank of Ireland.
ECP 2.1 Solar and Wind Constraints Report – Area K – v1.0
ECP constraints report for Area K
ECP 2.1 Solar and Wind Constraints Report – Area J – v1.0
ECP constraints report for Area J
ECP 2.1 Solar and Wind Constraints Report – Area I – v1.0
ECP constraints report for Area I
ECP 2.1 Solar and Wind Constraints Report – Area H2 – v1.0
ECP constraints report for Area H2
ECP 2.1 Solar and Wind Constraints Report – Area H1 – v1.0
ECP constraints report for Area H1