ECP 2.1 Solar and Wind Constraints Report – Area G – v1.0
ECP constraints report for Area G
ECP 2.1 Solar and Wind Constraints Report – Area F – v1.0
ECP constraints report for Area F
ECP 2.1 Solar and Wind Constraints Report – Area E – v1.0
ECP constraints report for Area E
ECP 2.1 Solar and Wind Constraints Report – Area D – v1.0
ECP constraints report for Area D
ECP 2.1 Solar and Wind Constraints Report – Area C – v1.0
ECP constraints report for Area C
ECP 2.1 Solar and Wind Constraints Report – Area B – v1.0
ECP constraints report for Area B
ECP 2.1 Solar and Wind Constraints Report - Area A - v1.0
ECP constraints report for Area A
Firm Access Review
This document summaries the research and development phase, the core concepts of firm access allocation, the details of the new methodology and the next steps.
Qualification Trial Process (QTP) Call for Information
The QTP is the mechanism through which the TSOs are managing the transition to a wider portfolio of System Services’ Providers. This paper seeks stakeholder views on the current QTP process and areas the TSOs should focus on.
EirGrid Monthly Availability Report - November 2021
EirGrid Monthly Availability Report - November 2021