EirGrid - DS3 System Services Regulated Arrangements Awarded Contracts - Gate 6
This publication presents the results of the DS3 System Services Volume Uncapped Gate 6 procurement.
SONI - DS3 System Services Regulated Arrangements Awarded Contracts - Gate 6
This publication presents the results of the DS3 System Services Volume Uncapped Gate 6 procurement.
All-Island Transmission System Performance Report 2021
All-Island Transmission System Performance Report 2021
Outage Week 21(2022)-36(2022)
16 Week All-Island Generator Outage Plan
ECP-2.2 TSO Category A Batch
ECP-2.2 Category A Update to include nodal assignment, planning permission details and offer issuance quarters.
FFR assessment
In response to industry feedback the TSOs have published further details here on the calculation behind the FFR Performance Assessment (Section 5.14 of the DS3 System Service Protocol – Regulated Arrangements). This document has previously been circulated via email to existing Service Providers of the FFR service for their information.
EirGird Stakeholder Engagement Report 2021
A report summarising EirGrid stakeholder engagement activity over 2021.
Transmission Outage Programme 2022
Transmission Outage Programme 2022