System Margins Outlook Report 29.09

29 September 2023

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

Testing Tariff Rates for Calendar Year 2024

29 September 2023

EirGrid and SONI (the TSOs) published a consultation paper on 21st July 2023 concerning the Testing Tariff for the upcoming calendar year, 1st January 2024 to 31st December 2024.The consultation period closed on 11th August 2023 with comments on the consultation paper received from two (2) respondents. Having reviewed the responses, the TSOs published a recommendation paper on 24th August proposing a number of recommendations to the Regulatory Authorities (the RAs) for their consideration and approval. The Single Electricity Market (SEM) Committee published their decision paper SEM- 23-0763 on 27th September 2023.

Future Arrangements for System Services – Auction Design – DotEcon Afry Workshop Q&A

28 September 2023

On 20 September 2023, EirGrid and SONI hosted a workshop where our partners DotEcon and Afry presented their proposals for daily auction arrangements for system services, as set out in their recommendations paper (which should be read in conjunction with the accompanying supporting note). The slide deck and Q&A from the workshop have now been published.

Future Arrangements for System Services – Auction Design – DotEcon Afry Workshop Slides

28 September 2023

On 20 September 2023, EirGrid and SONI hosted a workshop where our partners DotEcon and Afry presented their proposals for daily auction arrangements for system services, as set out in their recommendations paper (which should be read in conjunction with the accompanying supporting note). The slide deck and Q&A from the workshop have now been published.

Outage-Week-40(2023)-03(2024)

27 September 2023

16 Week All-Island Generator Outage Plan

MPID311 CRU Approval Letter

26 September 2023

MPID311 CRU Approval Letter

MPID310 CRU Approval Letter

26 September 2023

MPID310 CRU Approval Letter

MPID309 CRU Approval Letter

26 September 2023

MPID309 CRU Approval Letter

MPID308 CRU Approval Letter

26 September 2023

MPID308 CRU Approval Letter