Independent Expert Panel Report

Volume 1 - Main Report

IEP Report 2015‌

Volume 2 - Appendices

Appendix 1:

Project Development and Consultation Roadmap

Appendix 2:

Volume 3 - Maps

Maps for Underground Cable Route Option

Maps for Overhead Line Route Options

A - Stage 1 Report - Guide to the Stage 1 Report

Guide to Stage One Report

B - Stage 1 Report - Main Report

Stage 1 Report - Main Report

C - Stage 1 Report - Appendices

Stage 1 Report - Appendix 3.1

Stage 1 Report - Appendix 3.2

Stage 1 Report - Appendix 3.3

Stage 1 Report - Appendix 4.1

Stage 1 Report - Appendix 5.1

Stage 1 Report - Appendix 6.1

Stage 1 Report - Appendix 6.2

Stage 1 Report - Appendix 7.1

D - Stage 1 Report - Mapping

Stage 1 Report - Figure 4.1

Stage 1 Report - Figure 5.1

Stage 1 Report - Figure 6.1

Stage 1 Report - Figure 6.2

Stage 1 Report - Figure 8.1

Stage 1 Report - Figure 8.2

Stage 1 Report - Figure 8.3

Stage 1 Report - Figure 8.4

Stage 1 Report - Figure 8.5

Stage 1 Report - Figure 8.6

Stage 1 Report - Figure 8.7

Stage 1 Report - Figure 8.8

Appendix 3: ‌

Grid West Route Corridor and Substation Evaluation Report

Appendix 4:

Independent Expert Panel Terms of Reference

Appendix 5:

Grid West HVDC Technology Review Report - PSC

Appendix 6:

Landowner Information Brochure Overhead Route Option

Appendix 7:

‌Landowner Information Brochure Underground Route Option

Appendix 8:

Underground Route Options Preliminary Evaluation Report Appendix B

Underground Route Options Preliminary Evaluation Report

Appendix 9:

Investigation into Mitigation Techniques for Cable Issues

Appendix 10:

Alternative North Mayo Substation Evaluation Report

Appendix 11:

Cable Studies for Grid West Partial AC UG Solution Appendix A

Cable Studies for Grid West Partial AC UG Solution Appendix B

Cable Studies for Grid West Partial AC UG Solution Appendix C1

Cable Studies for Grid West Partial AC UG Solution Appendix C2

Cable Studies for Grid West Partial AC UG Solution Appendix D

Cable Studies for Grid West Partial AC UG Solution Appendix E

Cable Studies for Grid West Partial AC UG Solution Appendix F

Cable Studies for Grid West Partial AC UG Solution Appendix G

Cable Studies for Grid West Partial AC UG Solution Appendix H

Cable Studies for Grid West Partial AC UG Solution Main Report

Appendix 12:

Environmental Appraisal of the Converter Station Site Selection at Flagford

Appendix 13:

‌Environmental Data for the HVDC Underground Cable Option

Appendix 14:

Environmental Data for the 400kV HVAC Overhead Line Option

Appendix 15:

Environmental Appraisal of 220kV HVAC Partial Underground Cable Section Options

Appendix 16:

Grid West Constraints Report